
Gang / Layout
Switch gang and layout, from single to multiple controls.
Key elements can be tailored per project and require feasibility evaluation.

Switch gang and layout, from single to multiple controls.

Installation method and wall box type to suit the project.

Intended control function, such as on/off or scene control.

Powering method and neutral requirement, subject to design.

Target load type, such as lighting, fan or other loads.

Optional wireless, wired or standalone connectivity.

Product color, texture and surface treatment.

Intended market and applicable compliance scope.
Options are subject to project feasibility.
Align requirements, explore configurations and verify prototypes.
Clarify project goals, use cases and key needs.
Define candidate options and product configuration.
Build and verify samples against the project brief.


Evaluate feasibility across product, design, supply and market requirements.

Confirm project scope and key requirements.

Assess product, technical and implementation feasibility.

Refine candidate configurations based on evaluation.

Confirm project direction for the next step.
Develop and review samples to confirm key design and user experience.

Prepare the agreed configuration.
Check appearance and operation.
Subject to agreement
Confirm the selected finish, layout and configuration for each project version.

Concept
Refinement
Project Version
The final scope — product, packaging, documentation and supporting materials — is defined through project agreement.

Selected configuration
Agreed design
Agreed content
Agreed packing and shipment
Explore project options, evaluate feasibility and define the scope together.